Ops!
Size
No. of bathrooms
Model
No. of floors
No. of bedrooms
Architecture
No. of rooms
With a floor area of 146 m2 on the ground floor and in the attic, Klasik G 146 combines functionality with high adaptability. It boasts a floor plan design that can easily be adapted to the changing needs of family members over time.
On the ground floor, a centrally designed entrance with an anteroom and wardrobe area leads into the living area, which is designed as a bright and open space. The living area on the ground floor is connected to the surrounding nature through large glass surfaces, allowing for a visual expansion of the living area into the exterior. A handy pantry optimizes the usability of the kitchen, while the climate comfort of the house is regulated from the utility, which also doubles as a laundry room. The comfort of the house is provided by an additional bathroom with a modern shower and an extra room, which can function as a home office or storage room.
In the attic, the central feature are two spacious and extremely bright children’s rooms. They are also illuminated through skylights, creating a bright and pleasant atmosphere ideal for play and creativity. The attic bedroom is equipped with a convenient separate walk-in closet, which provides the utmost practicality and comfort. Particularly impressive is the spacious bathroom in the attic, which features a large and modern shower as well as enough room for a bathtub.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.