Klasik S 120 is a prefabricated wooden home, presenting a a compact solution for those seeking the attributes of spacious houses on just 120 m2 of living space. With a modern ground floor design and optimal room layout in the attic, the house creates an ambiance of homeliness, brightness and warmth.
On the ground floor, the living area is organized as an open, bright space with excellent space utilisation. The kitchen and dining area are connected to the living room, which offers perfect comfort and relaxation while allowing residents to spend quality time watching movies, reading or socialising. In addition to the entrance with a wardrobe, the ground floor also features a guest toilet and utility room with a laundry area. What is more, the ground floor also allows for the installation of a shower for pets.
In the attic, there are three bedrooms, which are characterised by thoughtfully placed skylights that invite natural sunlight and comfort into the interior. Here, you will also find a large bathroom, which according to the customer’s wishes features either a bathtub or a shower.
S 120 is available in two versions: Klasik and Trend. The Trend version features and extended roof that shades the living area of the house, reducing heat load during summer heatwaves and providing a covered outdoor area for relaxation and free time. At the customer’s request, we can install everything necessary for an outdoor kitchen, which further facilitates social gatherings all year round.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.