Klasik T 134 is a prefabricated wooden home, designed to provide its residents with a pleasant and carefree living for decades to come. It ensures comfort and high living standards on just 134 m² of space.
Customers who have opted for this house describe the experience of living in it with superlatives. Among the highlights they list is the bright and functional living area, where the kitchen, dining room, and living room dynamically intertwine and connect to form a comprehensive whole. The living area is characterised by large glass surfaces that provide an abundance of natural light and bring the home closer to the outdoor terrace or garden.
In addition to the entrance with a wardrobe, the ground floor offers a guest toilet, utility room, laundry, and storage room under the staircase. Another advantage of the house is a large office on the ground floor, which can be converted into an extra room or guest room.
The sleeping area in the attic offers three spacious bedrooms. The comfortable and bright children’s rooms provide plenty of space for studying and creativity. The master bedroom is designed for maximum comfort and relaxation, hence a separate wardrobe area for well-organized clothing. The attic bathroom comes with a large shower, which can be replaced with a bathtub at the customer’s request. A unique feature of T 134 is the common space in the attic – a gallery that allows for various adaptations over time to meet the changing needs of the family.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.