Ops!
Size
No. of bathrooms
Model
No. of floors
No. of bedrooms
Architecture
No. of rooms
Kubus B 126 is a prefabricated wooden home that represents a compact and ideal solution for those seeking the attributes of a spacious home on just 126 m2 of floor area.
On the ground floor, the living area is organized as an open, bright space wthat includes a convenient corner for a small office. The kitchen features a modern design and boasts a convenient pantry. The dining room is spacious and bright, and the living room is ideal for throwing a movie night in the comfort of a warm home. In addition to the entrance with a wardrobe, the ground floor of the house also offers a utility room with a laundry area and a guest toilet.
The attic includes three comfortable bedrooms and a cozy bathroom, which in addition to a luxurious bathtub also features a large modern shower. The utility value of the attic is reflected in a central common space that allows for adaptations over time. It can double as a playroom, study, extra wardrobe or gym.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.