Ops!
Size
No. of bathrooms
Model
No. of floors
No. of bedrooms
Architecture
No. of rooms
If you are looking for a prefabricated wooden home with an optimal layout, contemporary ground floor design and an attic with three bedrooms, Kubus J 166 is the right choice for you. With a floor area of 166 m2, the house strikes the right balance between practicality and style, ensuring complete comfort.
The layout of the ground floor provides comfort and functionality. The open-plan space allows for easy transitions between the kitchen, dining area and living room, creating a carefree atmosphere for socialising, meal preparation or indulging in everyday activities. Large glass surfaces bring in plenty of natural light and connect with the outdoor environment, making the interior bright and extending the living area out onto the terrace, outdoor room or covered outdoor kitchen.
The attic includes two spacious children’s rooms, offering plenty of space for playing, studying or creativity. The comfortable master bedroom is designed as a bright space, ideal for relaxation and rejuvenation. It features a separate dressing area with a makeup corner, which can also double as a study room. The attic bathroom is distinguished by its spaciousness and modern design, which features a large shower, bathtub and enough space for two sinks.
The attic is characterised by an external lounge. It connects all the rooms and creates a sense of openness and breadth, while also allowing for a natural connection with the outdoors. Here, you can relax while enjoying the view of the surrounding landscape, enjoy your morning coffee in the fresh air or unwind during sunset. The lounge was added to the house not only due to its utility value, but also an aesthetic element that will elevate your living experience to a higher level.


Get in touch for additional information

What are the benefits of a prefabricated home?
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.