Prima 125 is a prefabricated wooden home, designed for people who love open spaces and are looking for single-story house with a contemporary design. Spanning over a living space of 125 m², the floor plan is thoughtfully planned to provide maximum comfort for a couple or family.
The living area is designed as a unified space with large glass surfaces that conjure a bright, spacious ambiance. A large, modern kitchen with an island transitions into the dining area and living room, where there is enough space to accommodate a fireplace. The living area visually extends onto the outdoor terrace and the surrounding landscape. Featuring a canopy, the outdoor space provides a pleasant ambiance for social gatherings all year round.
At the entrance of the house, you will find a wardrobe and utility room with a laundry area. What is more, a large storage room is available for good organization of the household.
In the sleeping area, the house features two larger children’s rooms, each with its own separate bathroom featuring a bathtub and shower. The master bedroom is designed with a large wardrobe and its own private bathroom, where a shower is installed.
Single-story houses are pleasant and functional, ensuring a high quality of living through all the stages of life.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.