If you are looking for a prefabricated wooden home with a trendy look and unique design character, Trend A 148 is the right choice for you!
The ground floor features a spacious living area with a kitchen, dining room and living room, offering plenty of living comfort for each family member. In addition to the entrance with a large wardrobe, the ground floor also features a guest toilet and a large utility room with a laundry area. Moreover, there is a handy storage room under the staircase.
The design of the attic includes two very comfortable and bright children’s rooms, a cozy master bedroom and separate dressing room with a makeup corner. A special feature of the attic is the spacious design of the bathroom, which offers a handy shower along with a luxurious bathtub for true relaxation.
Standing out are also extensive eaves on the longitudinal sides of the house, which provide shade during hot summer days and additionally protect the house from extreme weather conditions in the winter. The characteristic modern appearance and refined architectural design of the house that spans across 148 m2 have already delighted many of our customers.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.