Ops!
Size
No. of bathrooms
Model
No. of floors
No. of bedrooms
Architecture
No. of rooms
Trend C 145 is a prefabricated wooden prefabricated home that stands out for its design. Tailored to meet the needs of the most demanding customers, it ensures safety comfort and a carefree living for decades to come. Its design is architecturally refined and it boasts an excellent utilization of space, enabling a high quality of living on merely 145 m².
On the ground floor, the central living area is designed as an open, bright space that dynamically connects the living room with the kitchen, dining area and convenient pantry. The ground floor layout also features a bathroom, utility room with a laundry area as well as an office, which can double as a large wardrobe or guest room if needed.
For a harmonious living, the attic offers two spacious children’s rooms with enough space for playing, studying or creativity. The comfortable master bedroom boasts a separate walk-in closet, and there is an additional wardrobe or storage room available by the staircase. In the attic, a comfortable bathroom with a large shower and a cozy bathtub steals the spotlight.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.