Ops!
Size
No. of bathrooms
Model
No. of floors
No. of bedrooms
Architecture
No. of rooms
D 141 is a prefabricated wooden home that offers an ideal layout with plenty of comfort for all family members. On a floor plan of 141 m², it offers plenty of flexibility for adaptations based on the changing needs of family members.
On the ground floor, the living area is designed as an open, bright space that connects the living room with the kitchen and dining area. The kitchen includes a larger island, which will serve as the focal spot for family or social gatherings. In addition to the entrance, which comes a wardrobe, the ground floor design also features a bathroom with a shower, a utility room and a storage space under the staircase. Another advantage is a large office on the ground floor, which provides enough space for two large desks.
The sleeping area on the upper floor offers three spacious bedrooms. In the comfortable and bright children’s rooms, there is plenty of space for creativity or studying. The master bedroom is designed to provide maximum comfort and relaxation, featuring a separate wardrobe for well-organized clothing. A special feature of the house is the spacious and modernly designed bathroom with a large shower and enough space for a sauna or a luxurious massage bathtub. In addition to the bathroom, the upper floor also includes a large laundry room for storing or drying clothes.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.