Trend V 146 is a prefabricated wooden home offering an excellent room layout and providing the utmost comfort for all family members. With a floor area of 146 m², the house ensures a high quality of living and supports a fast-paced modern lifestyle.
The centrally located entrance to the house leads through a foyer with a wardrobe into the living area, where the kitchen, dining room and living room are designed as one spacious area. Large glass surfaces ensure plenty of natural light, while also visually extending the living environment outward to the terrace or garden, additional summer room under a bioclimatic pergola or a covered outdoor kitchen if the customer so desires.
In the living room, there is enough space to install a fireplace, which will create a cozy warm atmosphere during cold winter days. The ground floor of the house also features a bathroom with a shower, a storage room under the staircase and a utility that doubles as a laundry room.
The attic is designed with a modern and functional lifestyle in mind, offering two separate bathrooms with showers. Two comfortable children’s rooms provide a pleasant space for playing, studying and creativity. The master bedroom is spacious and bright, and the adjoining wardrobe is designed as a separate room. At the customer’s request, a direct entrance from the bedroom is also possible.



What are the benefits of a prefabricated home?
Get in touch for additional information
Customisation options
Construction stages
BASIC
3rd construction stage
Scope: Completed exterior structure
Duration: 90 days
- Construction site organization (construction sign, toilet, insurance during construction).
- Construction of a wooden house structure (external and internal walls, roof structure).
- Poduction and assembly of the wooden home.
- Installation of external joinery (windows, doors).
- Covering the house with roofing and sheet metal work.
- Insulation of the wall assembly with a decorative finishing layer.
MEDIUM
4th construction stage
Scope: Rough assembly work
Duration: 120 days
- All benefits of the Basic construction stage.
- Rough routing of electrical installations in walls.
- Rough routing of installations for heating and ventilation.
- Rough routing of plumbing installations.
- Closing of walls and ceilings.
- Execution of screed.
FINAL
5th construction stage
Scope: Turnkey home
Duration: 180 days
- All benefits of the Medium construction stage.
- Painting.
- Installation of fine electrical wiring (sockets, switches) and mechanical installations.
- Supply and commissioning of heating and ventilation equipment (e.g., heat pump).
- Ceramic works and floor coverings.
- Installation of sanitary equipment.
- Interior wooden stairs.
- Interior doors.
Advantages of our systems
Energy efficiency
Earthquake safety
four times lighter and more
adaptable than a brick one. It can withstand shocks up to
9th degree on the Richter scale.